How we work: six phases, zero loose ends

OSS treats safe execution and technical acceptance as part of the delivery plan. Requirements are established for each assignment and carried through site preparation, supervision, inspection and documented close-out.

Delivery model

From first survey to long-term support.

01

Assess

Understand the asset, site conditions, client requirements and operating constraints.

02

Define

Confirm the scope, interfaces, technical approach and acceptance criteria.

03

Plan & Procure

Coordinate resources, approvals, materials, access and safe work methods.

04

Execute

Deliver the works with supervision, quality checks and controlled site activity.

05

Test & Hand Over

Verify performance and hand over the records the client needs.

06

Support

Remain available for follow-up maintenance, spares and future upgrades.

HSE, quality & delivery assurance

Safety and acceptance built into every plan.

Step 01

Plan the Work

Define scope, interfaces, method statements, risk assessments, permits and site access requirements.

Step 02

Control Execution

Identify supervision, competent resources, PPE and task specific controls for lifting, height and other relevant hazards.

Step 03

Check Quality

Establish material checks, inspection points, appropriate test methods and agreed acceptance criteria.

Step 04

Close with Evidence

Record findings, address outstanding items and provide the completion documents required by the contract.

Deliverables

Method statements · Risk assessments · Inspection and test records · Completion documentation